| Location |
The
ODS Tower is located in the heart of Portland’s Central
Business District at 601 SW Second Avenue. The ODS Tower
is ideally located within walking distance of numerous
shops,
restaurants
and entertainment
venues. |
| Building
Area |
400,000
SF Class A office space on 24 floors |
| Avg.
Floor NRA |
22,134
SF |
| Amenities |
Conference
facilities, daycare facility, gourmet coffee and food service,
24/7 uniformed security with a lobby presence, secure bicycle
parking with adjacent restrooms featuring showers and lockers,
tenant storage spaces, ATM machine, exterior terraces on
selected floors |
| Accessibility |
The
ODS Tower is conveniently located in downtown Portland.
It is accessible by the MAX’s
Morrison/SW 3rd Avenue station. (TriMet:
Public Transportation for Portland, OR) |
| Ownership |
Morrison
Street CF, LLC
|
| Management |
Ashforth
Pacific, Inc. provides an experienced on-site property management
team. |
| Major
Tenants |
The
ODS Companies/Lane Powell/Nordstrom Rack/CorVel Corporation |
| Year
Built |
1999 |
| Parking |
Garage
– 385 stalls |
| Security
& Access |
24/7
uniformed security with a lobby presence and card key access |
| Construction |
Concrete
base clad in granite, with steel frame office tower in
matching precast concrete above |
| Foundation |
Primarily
steel-driven piling with reinforced concrete |
|
| Plumbing |
Basement
level supply distributes cold water to all floors, serving
restrooms, drinking fountains and taps for tenant needs.
Three base building water tanks service restrooms only.
Waste and vent system directed to city waste water. Storm
sewer drainage system allows site water to be collected
and drained through surface drains located in the parking
lot areas. |
| Electricity |
Main
switchgear equipment supplies 480/277, three phase electrical
service to the bus riser system. A stepdown transformer
on each floor provides 208/120, three phase electrical
service with a capacity of 225 amps. |
| Roof |
Concrete
construction with a UV-resistant “traffic topping.” Mechanical
penthouse structure roofs are covered with a 75+ year rated
roof membrane. |
| Seismic |
Design
based on 1997 revised Uniform Building Code – Zone
3, including 80 mph Wind Zone
|
| Structural
Frame |
Seven
level concrete base structure built of conventional and
post-tension concrete. Top 17 floors are steel frame,
consisting of a brace-frame core and ductile-frame perimeter. |
| Elevators |
Otis
Elevator Company
7 gearless passenger; 4 geared passenger (parking); 1 geared freight 5,000
lb capacity |
| Utility |
Electrical
– PGE: 2004-7,457,545 Kwh; average monthly demand – 1,790
Kw
Water – City of Portland
Trash Hauling – River City Disposal
|
| Mechanical |
Chiller
service contractor: MacDonald Miller
6 R-22 Compressors |
| Major
Operational Contractors |
- Cleaning
– Dependable Building Maintenance
- Window
Cleaning – Premier Building Maintenance
- Security
– ACSS
- Metal/Stone
– Almet Metal/Columbia Stone
- Building
Controls – Alliant Systems & MacDonald Miller
- Life
Safety System – Grinnell monitored by Siemens
Building Technologies
|
|